BARNSTABLE – Crews from the Barnstable DPW will start a resurfacing project on Route 149, Lumbert Mill Road, and Bumps River Road on Monday, September 8th.
The roads will be reduced to one lane from 7 AM to 5 PM until mid-October.
Work will take place on Route 149 between Race Lane and Osterville-West Barnstable Road, while work on Bumps River Road goes on between Pond Street and Osterville-West Barnstable Road.
The work on Lumbert Mill Road will take place north of Route 28.