Chip Sealing Work Planned on Several Sandwich Roads

Sandwich Town Hall

SANDWICH – Sandwich town officials are advising drivers of chip sealing work to be conducted on twelve roads beginning on Tuesday, September 20. 

Residents on the roads are required to turn off their irrigation systems starting on Monday, September 19 during the hours of 4 am to 6 pm to avoid work delays due to wet pavement. 

The roads will remain open to traffic, but officials advise that delays are possible and drivers should use alternative routes when possible.

All States Material Group of Sunderland will be conducting the work.

The full list of roads to be impacted by the asphalt-rubber surface treatment work can be found below as well as on the Sandwich Department of Public Works website:

  • Checkerberry Lane
  • Earl Road
  • Fox Bottom Circle
  • Grandwood Drive
  • Ladyslipper Lane
  • Lichen Lane
  • Little Acorn Lane
  • Manor Drive
  • Nobby Way
  • Old Fields Road
  • Settlers Path
  • Van Buskirk Way
About Grady Culhane

Grady Culhane is a Cape Cod native from Eastham. He studied media communications at Cape Cod Community College and joined the CapeCod.com News Center in 2019.



CapeCod.com
737 West Main Street
Hyannis, MA 02601
Contact Us | Advertise Terms of Use 
Employment and EEO | Privacy