COTUIT – The Barnstable Department of Public Works (DPW) will begin a drainage construction project on Oyster Place Road near Town Dock in Cotuit.
The two-work will begin Monday, March 21st, with operations taking place between 7 a.m. and 5 p.m.
Motorists are advised to avoid that area where possible, as vehicle access will be limited.
Speak Your Mind