PLYMOUTH – Workers at the Pilgrim Nuclear Power Station in Plymouth have repaired the crack discovered last week in a feedwater heater, and the station is back to full power, according to Nuclear Regulatory Spokesman Neil Sheehan.
The station had reduced to about 20 percent power to make the repairs.
The station powered back up on Saturday afternoon.