BOURNE – Barnstable Sheriff’s Office inmates recently provided construction labor at this pumping station at the Buzzards Bay Water District in Bourne. Work included converting a former vehicle garage into space to house the pump, with insulation added to ensure the pump won’t freeze and malfunction in cold weather. Deputy Sheriff Blaise Cabral and his four-man inmate crew were able to make this a quick, one-day job, saving Water District ratepayers approximately $1,100 in labor costs.
Inmates convert pumping station at Buzzards Bay Water District
April 26, 2018
From The CapeCod.com NewsCenter
- VIDEO: Meet Studio G, The Architects Selected for Maurice’s Campground Affordable Housing Project
- Martha’s Vineyard Man Wins Jaws Lottery Prize
- VIDEO: Summer Meal Options for Kids and Grab and Go Event with Family Pantry of Cape Cod
- Cape Cod Foundation Begins $3.5M Community Campaign
- Falmouth Road Race Signups Ongoing
- New Federal Leasing Of Northern Atlantic For Wind Power
- Lawmakers Unconvinced of Machine Gun Range Necessity for Joint Base
- Cape Cod Healthcare Announces May Blood Drives
- Center For Coastal Studies To Conduct Second Cleanup Event On Cuttyhunk Island
- WATCH: Learn more about Cape Cod Sharks at the Atlantic White Shark Conservancy’s two outreach centers
- Sandwich Town Meeting Tackles Nips Ban and More Monday
- Lawmakers Pen Letter to Holtec Amid Evaporation at Pilgrim Nuclear Power Station
- Dennis Receives Grant To Protect Water Supply Within The Flax Pond Property